The documents contained within the LDF will be prepared and adopted on a rolling basis. Once a document is prepared and adopted it will then be monitored and reviewed independently of other LDF documents. Therefore the new LDF will not be adopted as a single document which is how the adopted Local Plan was prepared.
The Local Development Scheme will set out the timetable for the production of documents over a three year period.